Skip to content

About Surat Metro

Surat Metro is a 40.35 km rapid transit system (total length: 21.61 km Red Line + 18.74 km Green Line) being built by Gujarat Metro Rail Corporation (GMRC) across two corridors in India's diamond and textile capital. GMRC's head office is at Karmayogi Bhavan, Gandhinagar, with a project office address at SUDA Bhavan, Vesu, Surat. The Union government approved the project on 11 March 2019 at a sanctioned cost of Rs 12,020.32 crore, with 50:50 equity funding from central and state governments plus bilateral loans from France's AFD (EUR 250 million) and Germany's KfW (EUR 442.26 million). The Red Line runs 21.61 km north-south from Sarthana to Dream City with 20 stations, including a 6.47 km underground stretch. The Green Line covers 18.74 km east-west from Bhesan to Saroli with 18 elevated stations. Both lines connect at Majura Gate, the network's only interchange.

Project Timeline

August 2012

Surat Municipal Corporation proposed four metro rail routes connecting key commercial and residential corridors across the city.

January 2017

Government of Gujarat approved two corridors - north-south (Sarthana to Dream City) and east-west (Bhesan to Saroli) - as the Phase 1 scope.

9 March 2019

Public Investment Board approved the Detailed Project Report prepared by Delhi Metro Rail Corporation (DMRC).

11 March 2019

Union Cabinet approved the project at a sanctioned cost of Rs 12,020.32 crore with 50:50 equity from central and state governments.

18 January 2021

Prime Minister Narendra Modi laid the foundation stone in Surat, marking the official start of construction.

28 January 2021

Agence Francaise de Developpement (AFD) signed a EUR 250 million loan agreement for Phase 1 construction.

17 December 2021

Germany's KfW development bank signed a EUR 442.26 million loan - the largest bilateral loan for the project.

June 2023

Titagarh Rail Systems won the Rs 857 crore rolling stock contract to manufacture air-conditioned metro coaches.

August 2025

TBM Amrit completed breakthrough at Chowk Bazar Station, marking a major milestone in the 6.47 km underground tunneling on the Red Line.

October 2025

DB Engineering & Consulting (Germany) signed the contract for signaling and train control systems.

29 March 2026

First trial run on the 8.5 km Diamond Corridor between Dream City and Althan Tenement - 7 stations tested for safety and braking systems.

Metro Features

Air-conditioned trains

Climate-controlled coaches across both lines, designed for Gujarat's summer temperatures exceeding 40 degrees C.

WiFi-enabled coaches

Onboard WiFi connectivity for passengers during their journey.

Contactless ticketing

Smart Cards with QR code and NFC support. Recharge at counters or online, Rs 50 refundable deposit.

Accessible stations

Elevators, ramps, tactile paths, and platform screen doors at every station. Divyang passengers receive 50% fare concession.

BRTS and bus integration

Planned feeder bus connectivity and BRTS stop proximity for first-mile and last-mile commutes.

Real-time passenger info

Electronic display boards at platforms showing next train arrival, destination, and estimated wait time.

CCTV surveillance

Security cameras covering all stations, platforms, entry/exit points, and train interiors.

Solar power generation

Solar panels installed at stations to offset energy consumption and reduce the network's carbon footprint.

About This Website

suratmetro.in is an independent Surat Metro website built and maintained by Meet Dhanani to help residents, commuters, and visitors navigate the upcoming metro system. We are not affiliated with Gujarat Metro Rail Corporation (GMRC), the Government of Gujarat, or any government body. The GMRC logo and branding remain the property of Gujarat Metro Rail Corporation.

All data on this site is sourced from and cross-referenced against publicly available information from GMRC, Wikipedia, Surat Municipal Corporation, and verified news sources including Times of India, MetroRailNews, and The Metro Rail Guy.

Fare estimates, train timings, and route details shown before commercial operations begin are based on the Detailed Project Report (DPR) and comparable metro systems in India. For official information, contact GMRC directly or visit our contact page.

Explore Surat Metro

Plan your journey across both corridors or browse station details.

ESC