Skip to content
Expected route and fare details - subject to change before commercial launch

Adajan Gam to Surat Railway Station Metro Route

5.05 km across 11 stations on the Red and Green Lines. Transfer at Majura Gate interchange. Token fare Rs 20, estimated travel time 12 minutes.

Stations

11

Distance

5.05 km

Travel time

12 min

Token fare

Rs 20

Station-by-Station Route

0.5 km1 min
1.55 km3 min
Majura GateInterchange
2 km4 min

Transfer to Red Line platform. Allow 3-5 minutes for the walk.

2.3 km7 min

Continue on Red Line

2.85 km8 min
Gandhi BaugUnderground
3.35 km9 min
Chowk BazarUnderground
3.85 km10 min
Maskati HospitalUnderground
4.4 km11 min
Surat Railway StationEndUnderground
5.05 km12 min

Fare Breakdown

Token

Rs 20

Single journey

Smart Card

Rs 18

10% discount

Student

Rs 15

25% concession

Senior Citizen

Rs 15

25% concession

Fares are estimated and subject to change before commercial launch. View all fare details.

Journey Tips

Line transfer required at Majura Gate

This route crosses from the Green Line to the Red Line at Majura Gate, the network's only interchange. Walk between platforms takes 3-5 minutes. Follow the overhead signs to the connecting platform. Your ticket covers the full journey including the transfer - no need to buy a second ticket.

4 underground stations on this route

The section between Labheshwar Chowk and Chowk Bazar runs 6.47 km underground. Trains slow slightly through the tunnel section due to tighter curves. All underground platforms have forced ventilation and fire suppression systems. Mobile signal may drop briefly between underground stations.

Save Rs 2 with a Smart Card

A Smart Card costs Rs 150 (Rs 100 balance + Rs 50 refundable deposit) and saves 10% on every ride. For this route, that means Rs 18 instead of Rs 20 per trip.

Need a different route?

Open Route Planner

Route data based on GMRC corridor specifications. Distances and timings are estimated and may change before commercial operations.

ESC